Uncategorized

Valance Work and LEDs

Posted on

I took a pause in laying sub-roadbed for the WVR to begin work on the valance for the mountain “helix” this week. I wanted to get the upper portion of this area under way while I can easily get to it. I used white finish hardboard paneling for the top surface, it has a nice […]

Uncategorized

A Mountain of Work 2

Posted on

After much cutting of wood, leveling, screwing, and a few choice words, the sub-roadbed for the mountain helix is nearly finished. I still need to add a few more supports in there. I plan to add a trestle on this side for the upper track where it passes over the middle track along with a […]

Uncategorized

A Mountain of Work

Posted on

I started building the second generation Wildcat Valley Railway a few weeks ago. I had been thinking I’d work on it in my spare time and would get it done sometime in the not too distant future, but I had forgotten how much thought and work it takes to get something of this scale done. […]

Uncategorized

Benchwork Continues

Posted on

In designing the new Wildcat Valley Railway, I wanted to have a two level track plan, but I really don’t like the idea of a helix. I do really like mountainous terrain with tunnels and bridges though, so I plan to use a couple of areas with looping track that is mostly open and visible […]